Project Description
This is a design and build project for a canal in a City in Miami-Dade County. The current canal embankment has been washed away due to the water fluctuations and the depth of the canal. The City engaged Landshore® to engineer the project with the most cost-effective solution that provides a long-lasting embankment stabilization.