Project Description

This is a design and build project for a canal in a City in Miami-Dade County.  The current canal embankment has been washed away due to the water fluctuations and the depth of the canal.  The City engaged Landshore® to engineer the project with the most cost-effective solution that provides a long-lasting embankment stabilization.

Project Photos